vikesh.
Working paper · 2026

When AI capability outpaces adoption

A faster model can leave a business process just as slow. The work shifts to the people who supply context, verify outputs, and make decisions.

Where the quote waits

Imagine a machine shop that takes an hour to prepare a quote. A model brings the first draft down to six minutes. The customer still gets an answer the next day because one estimator has to verify the drawing revision, check the margin, and find out whether a machine is free. The estimator also handles the existing backlog. In a demo, you see the six minutes. The customer experiences the queue.

This is the gap I keep running into in manufacturing. AI capability can advance faster than a company’s ability to use it. In a workflow where the model is already good enough to do a particular step, the constraint often moves to people. It shows up in the time they spend finding context, checking the output, or getting a decision from someone authorized to make it. That is a problem of how the work is organized. The person in the middle may be doing exactly what the business needs.

What capability benchmarks and adoption surveys measure

METR estimates the difficulty of software tasks an AI agent can complete at a given success rate using how long a human expert would take to do the same tasks. The benchmark offers a way to compare models on a defined set of tasks. A shop deciding whether to use AI for quoting has its own tasks, context, and cost of error. METR task-completion time horizons

A working paper based on the U.S. Census Bureau’s Business Trends and Outlook Survey estimated that 18% of firms used AI in a business function during the November 2025 to January 2026 survey period. The share was 32% when weighted by employment. The survey measures reported use. A company that drafts marketing copy and a company that automates part of its quote intake can both count as users. Census Bureau working paper on AI adoption

These measures have different units, so I wouldn’t use them to calculate the size of a capability gap. A better test at a single company is to compare what the model can do on representative work with what the business can use under its normal rules.

The work that moves to people

Supplying context. The model can read a drawing once it has the right file. The business still needs a place to find the current revision and a way to tell whether the customer agreed to it. If the answer lives in one person’s inbox, the system still depends on that person.

Checking the draft. A confident estimate can hide a bad assumption about setup time, an outside process, or a material substitution. When reviewers have to reconstruct the whole estimate, drafting faster saves less than it first appears. A quote that points to the rate table, similar job, and drawing revision gives the estimator a shorter path to deciding what to trust.

Making the decision. Some jobs need a new fixture or approval to go below a margin threshold. Those calls have an owner for a reason. A well-designed workflow identifies the exception, sends it to the right person with the relevant evidence, and records what they decided.

How I would test the bottleneck

I’d start with a sample of finished jobs that includes ordinary repeat work and jobs that went sideways. First, I’d test whether the model can prepare a usable draft when it has the same information the estimator had. I’d have an estimator score what is correct, what is missing, and what would be expensive to get wrong. Persistent errors on well-specified jobs are a reason to improve the model or narrow the task.

Then I’d run comparable incoming work through the actual process. I’d track elapsed time from request to approved quote, time spent by reviewers, and the number of drafts that needed rework. If draft quality holds up but approved quotes still wait, I’d look at the queue and the handoff. If errors rise as soon as inputs come from actual customer emails, I’d look at intake and data quality. The two tests give the team somewhere specific to investigate.

The question I want to ask after a good demo is who still has to do what before a customer can use the result. The answer tells me where the next hour of work belongs.

Read the manufacturing quoting case study